Showing posts with label Quilts. Show all posts
Showing posts with label Quilts. Show all posts

Wednesday, June 12, 2013

Quilt #2 On The Frame

With quilt #1 off to LA, I had time this week to put the layers of quilt #2 together and mount them on the frame. It is quite a process. First the back of the quilt top has to be checked block by block for loose threads. Then the three layers - quilt top, batting, and backing - are laid out together to make sure they are ironed smooth and sized to match. The carpet in the living room is the only place big enough for this process.


After the batting and backing are cut to fit, the top and batting are pinned every few inches around the perimeter and then the two layers are rolled together for transport to the quilt frame in the basement. It takes some trial and error to line all three layers up on the frame. A small inconsistency in tension or angle could become a big problem as the quilt is stitched and winds onto the front roller.


Now that everything is in place I just have to decide which of several design options to use for the hand quilting. Hmm - diagonals, squares, curvy lines, hearts, zig zag - too many options. Maybe I should take a vote.


Wednesday, June 5, 2013

Folded Up, Ready to Go

One quilt done, one to go.

The first of two wedding quilts took flight to LA on Tuesday in Rebecca's carry on. Her trip comes at an opportune time. After spending a few hundred hours on hand quilting, I don't trust the post office.


Wednesday, March 13, 2013

The Last Stitch

Two days ago I finished the last stitch on the last block of the first wedding quilt. Sixty-three blocks, three thousand seven hundred and eighty inches of hand stitching give or take an inch or two. Yippee!


All I need to do now is sew on the binding and it will be ready to fly away to the happy couple in Los Angeles. Then I can mount the second wedding quilt on the frame and start all over again. I hope our third child doesn't plan to marry any time soon.

Saturday, December 8, 2012

Quilting Bee

In May when Rebecca returned from school in Santa Fe, we decided to hand make a wedding quilt for each of her brothers and their brides. Now that the projects are no longer a secret, I can post about the process.

The first step is to find patterns and fabric. We settle on using 1930s and 1940s reproduction prints that remind us of those used in my grandmother's quilt. A simple quilt pattern is needed to show off the colorful fabric designs. Our first thought, the classic double wedding ring, is vetoed after research reveals it to be among the most complicated. We are both accomplished at sewing, but neither one of us has ever made a quilt. On a trip to the Mill Ends Store we find a great book of contemporary patterns called Sunday Morning Quilts.

The pattern for Aaron and Elizabeth, called "Sunday Morning," is made up of ten inch blocks with five colored strips and one white strip in each block.

"Checkerboard," for Gary and Elise, alternates white and colored three inch squares. The fabrics are the same in each quilt. 


Calculating the number of fabrics to buy and the yardage requires diagrams and higher math. Five visits to three stores results in a pile of twenty colored prints and five white on white prints. My friend Alice hears about the project and donates three of her husband's old Armani shirts to use along with the other whites.


Buying the fabric is the easy part. Now we have to cut little pieces out of big pieces so we can sew them back together into blocks to make 72" x 90" quilt tops. We set up tape lines on the work table in the studio and go to work cutting strips. It takes several hours over three days. With the strips cut, Rebecca starts piecing the "Sunday Morning" quilt top for Aaron and Elizabeth, the first bridal couple.


Somewhere in the middle of all of this I start to think ahead to the actual hand quilting and realize we need a quilting frame. What would we do without the Internet? A beautiful oak frame pops up on Craig's List. Just one problem - the seller is a two hour drive away in Philomath and we need a truck to hold the 96" long frame. Alice saves the day with her truck. Off we go in the pouring rain.

The first quilt top is ready to be mounted on the frame set up in the basement "party room" by the middle of August. The top and batting are mounted on the back roller, the backing on the middle roller, and all three parts come together on the front roller. We are ready to quilt.


The first few blocks are slow going and my stitches are anything but straight. After a while I fall into a rhythm and find the hand quilting meditative. Good thing - my co-quilter, Rebecca, is ready to return to fall semester in Santa Fe - I'm on my own.


It is now December - between a trip to New Orleans for the second wedding and an eight week writing class not much quilting has happened in the last month and a half. The hand stitching is about two-thirds complete on the first quilt. Another month and it should be finished. Then the second quilt goes on the frame and we start all over. Rebecca will be home in another week. Two can quilt faster than one.